Grainger Completes 1MW Solar Panel

Share post:

On Monday, August 30, Robbinsville-based facilities maintenance supplier Grainger will host a sustainability forum to mark the installation of a 1-megawatt solar panel system intended to supply 40 percent of the electrical load for the 434,000-square-foot facility. The forum and open house will run from 11 a.m. to 1:30 p.m. at the Grainger Distribution Center, 18 Applegate Drive North and is free to attend. Visit www.grainger.com for more information.

According to Grainger, the forum will feature talks on sustainability by experts from Middlesex County Community College, the U.S. Green Building Council, SunPower of Trenton, and Alliance Energy Solutions, a Connecticut-based consulting firm with offices around the Northeast. A tour of the grounds, lunch, and networking will follow.

CE – US1

Related articles

Tess James named director of Princeton Program in Theater and Music Theater

Princeton University’s Lewis Center for the Arts has named award-winning lighting designer Tess James as the new director...

Foundation gives retired racehorses a future

A horse once headed for slaughter surged through traffic, scaffolding and parked cars on a Manhattan street, carrying...

Bristol Riverside Theater Review: Real Women Have Curves

Listening closely, you can discern the drama, comedy, and humanity inherent in Josefina López’s “Real Woman Have Curves”...

Mercer County Cultural Festival, Food Truck Rally Returns June 6

Mercer County will celebrate the region’s diverse cultures, music and cuisine during the 14th Annual Cultural Festival and...